The service includes in developing the study and analysis for the improvement of the minimum safety distances of the five deficient spans in the easement strip of the 138kV Transmission Lines.
The service includes in developing the study and analysis for the improvement of the minimum safety distances of the five deficient spans in the easement strip of the 138kV Transmission Lines.